Facilities

Seaport Facilities

Marine Terminals Outer Harbor Terminal (OHT) Berths 22-24 (Available For Lease) Available for Lease 1599 Maritime Street, Oakland, Ca 94607 Terminal Type: Container/Bulk/Break-Bulk/Ro-Ro Berths22-24 Length2,870 ft Water depth (MLLW)50 ft Reefer Outlets592 Total Terminal Area130 Acres Cranes4 Post-Panamax BerthsLength Water depth (MLLW) Reefer Outlets Total Terminal Area Cranes 22-242,870 ft50ft592130 Acres4 Post-Panamax Trapac Terminal Operator: TraPac, Inc. 2800 7th Street, Oakland, Ca 94607 Terminal Type: Container Berths25-33 Length4263 ft/1300 m Water depth (MLLW)50ft/ 15.2m Reefer Outlets1206 Total Terminal Area123 Acres Cranes5 Post-Panamax, 2 Super Post-Panamax BerthsLength Water depth (MLLW) Reefer Outlets Total Terminal Area Cranes 25-334,263ft/ 1,300m50ft/ 15.2m 1206123 Acres5 Post-Panamax, 2 Super Post-Panamax Everport Terminal Operator: Everport Terminal Services, Inc. 5190 7th Street, Oakland, Ca 94607 Terminal Type: Container Berths35-38 Length2,157 ft/657 m +100 ft/30 m dolphin Water depth (MLLW)50ft/ 15.2m Reefer Outlets346 Total Terminal Area90 Acres Cranes 4 Super Post-Panamax BerthsLength Water depth (MLLW) Reefer Outlets Total Terminal Area

Read More

Shore Power

About Shore Power Shore power is grid-based, high-voltage, electrical infrastructure in the maritime area. This allows ships to plug in to the grid while docked, dramatically reducing emissions from vessels at berth. This supports the Port of Oakland’s goal of going to zero emissions operations. Ships must be commissioned by the Port of Oakland prior to plugging into the shore power system. Commissioning is the process of preparing a unique vessel to successfully plug into the shore power system. Shipping lines should notify both their terminal operator partners and the Port when a vessel is scheduled to arrive and needs to be commissioned. Only ships commissioned by the Port’s Commissioning Agent will be allowed to plug in to the Port’s shore power system. Power usage is charged in addition to the commissioning cost. Click here for Oakland vessel connection data in April 2024, Jan-Apr 2024, and 2023 Eric Napralla Shore

Read More